River to River Trail Planning Study

The River to River Trail Planning Study is now complete.  The objective of the River to River Trail Planning Study is to recommend a preferred route for a non-motorized trail connection from the Kalamazoo County trail system to the Kent County trail system. Specifically, the trail plan looked at a route connecting the existing Kalamazoo River Valley trailhead at D Avenue in Cooper Township north to M-6 connector trail on 68th Street SE in Cutlerville. The complete document can be found at the following link: River to River Trail Planning Study or on the “Other Documents” section of KATS website.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s