Other Agency Documents

These documents were prepared by agencies other than the Kalamazoo Area Transportation Study.

METRO
Transit Asset Management Plan (10-01-2018)

Michigan Department of Transportation
Bicycle and Pedestrian Terminology Booklet

Introduction to Federal Aid (2016)
Presentation by E. Mullen, Michigan Department of Transportation

Evaluation of the I-94 Corridor Study from the Indiana State Line to US-127 South

Local Non-motorized Plans
2018 River to River (R2R) Trail Plan

2014 Kalamazoo Township Non-motorized Master Plan
Imagine Kalamazoo 2025 Master Plan
2019 Oshtemo Township Non-motorized-Plan
2020 Texas Township Master Plan
2014 Portage Comprehensive Plan

Regional Non-Motorized Plan
Southwest Michigan Region Non-Motorized Transportation Plan 2020


Other Documents of Interest

The views and opinions expressed in these document are those of the authors and do not necessarily reflect those of the Kalamazoo Area Transportation Study or its members.

Kalamazoo, MI Walkability Workshop (prepared by the Walkable and Livable Communities Institute for Disability Southwest Michigan).

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s